Preventative Maintenance for Hot Melt Equipment

Scheduled service that stops glue-mergencies before they start.

Chicago Glue & Machine’s preventative maintenance plans inspect, clean and service your hot melt equipment on a schedule, during planned downtime, so clogged nozzles, char and worn parts get fixed before they stop your line.

Does your line stop because of gluing equipment, only for your team to find something as simple as a clogged nozzle? Routine inspection and cleaning finds the root cause and removes it. Our plants see fewer clogs, fewer emergency calls and fewer surprise part failures.

What a PM Visit Includes

Tank inspection and cleaning; char and debris removal

Filter changes (tank and inline)

Nozzle and module inspection, cleaning or replacement

Hose and heater checks; temperature verification

Pump, pressure and air supply checks

A written report and a recommendation for the next visit

How Often to Schedule PM

We recommend an adhesive and equipment audit about every 2,000 hours the equipment is turned on, including warm-up and idle time. From there we set up an annual PM agreement that fits your run hours, adhesive and equipment, with more frequent visits if you run more than one shift. We do the work during scheduled downtime or a shutdown.

Equipment We Maintain

Hot melt units and tank-free systems, including Nordson* ProBlue and Mesa-style melters, Graco InvisiPac, ITW Dynatec and Astro units, plus applicators and hoses.

If something breaks between visits, our repair shop fixes it, and we can rent you a loaner while yours is in the shop. It’s all part of being one partner for your equipment, adhesive, parts and service.

Manuals and How-To Guides

Preventative Maintenance for Nordson ProBlue 10: Video Transcript (PDF)

Nordson ProBlue Temperature Change Instructions, English and Spanish (PDF)

Frequently Asked Questions

CGM recommends an adhesive and equipment audit about every 2,000 hours the equipment is turned on, including warm-up and idle time, with an annual preventative maintenance agreement set from there, or more often if you run more than one shift.
Tank cleaning, filter changes, nozzle and module service, hose and heater checks, temperature verification and pump and pressure checks.
Yes. CGM maintains ProBlue and Mesa-style melters as well as Graco, ITW Dynatec and Astro equipment.
No. CGM schedules PM during planned downtime or shutdowns.

*Nordson® is a registered trademark of Nordson Corporation. Chicago Glue & Machine has no affiliation with Nordson Corporation.

Through our custom-designed preventative maintenance services, we can help you prevent issues like this and more, including:

  • Equipment breakdowns that lead to overtime costs
  • Equipment failures that lead to team member injuries
  • Part failures that lead to expensive repairs and replacements
  • Equipment malfunctions that lead to faulty end-products
  • Equipment glitches that lead to missed deadlines
  • Adhesive failures that lead to production downtime

Our preventative maintenance services have proven to significantly reduce and in most cases eliminate the annoyances of clogged nozzles and other maintenance issues that frequently impact hot melt systems. To get started, we recommend scheduling an adhesive and/or adhesive equipment audit with our team to assess the current state of your operations. From there, we can work together to create a proactive plan that is tailored to your facility and equipment.

To schedule an audit and preventative maintenance service, call us at (800) 419-GLUE or fill out the form below.

  • This field is for validation purposes and should be left unchanged.